Walling Report February 2023

Date: 12 February 2023

Location: Boarshurst, Greenfield

Conditions: Dry and mild.

Objective: Continue the buid started at the previous practice meet.

It was unusually mild and very pleasant for the time of year. A 15m section of wall was already underway, started at the January 23 practice meet. The members continued with the build of this and were able to top out a section. An additional 6m of the original wall was taken down, dug out and the laying of foundations commenced.

An excellent and productive day was enjoyed by all.

Starting Position

The starting position of the wall. A section of wall from the previous practice meet was to be continued and a further section of wall taken down.

The starting position of the wall section from previous meet
Section of wall being taken down
Second section of damaged wall being taken down

Build in Progress

Build in progress
Build in progress 2
Build in progress 3
Build in progress 4
Build in progress 5
Build in progress 6
Paul considering a stone

Laying Foundations

Laying the foundation stones
Laying the foundation stones 2
Laying the foundation stones 3
Prep for topping

Topping Out

Topping out in progress
Topping out in progress 2
Topping out in progress 3

Finished

Finished section of wall