Walling Report February 2023
Date: 12 February 2023
Location: Boarshurst, Greenfield
Conditions: Dry and mild.
Objective: Continue the buid started at the previous practice meet.
It was unusually mild and very pleasant for the time of year. A 15m section of wall was already underway, started at the January 23 practice meet. The members continued with the build of this and were able to top out a section. An additional 6m of the original wall was taken down, dug out and the laying of foundations commenced.
An excellent and productive day was enjoyed by all.
Starting Position
The starting position of the wall. A section of wall from the previous practice meet was to be continued and a further section of wall taken down.